Unfortunately the transfer beams were left propped during constructiuon of the slabs which made the situation even worse. Transfer beam deflection at about 6 months was about 65mm and rising.
I did a report on a similar case a few years ago in northern UK.ġ6m RC transfer beam supporting a few floors of 8m span PT flat slab.